A vapor barrier is a polyethylene sheeting system installed on the ground and walls of a crawl space or basement to block ground moisture from migrating into the structural environment above. Understanding what a proper vapor barrier consists of, however, goes well beyond simply laying plastic on the floor.
Standard 6-mil poly sheeting has a relatively high vapor permeance rating, meaning it allows some moisture vapor to pass through over time, particularly as it ages and develops micro-perforations from foot traffic and environmental factors. A 20-mil reinforced vapor barrier significantly reduces vapor diffusion and resists punctures from gravel, debris, and service personnel working in the crawl space.
Seam treatment is equally important to the material specification when it comes to achieving a functioning vapor barrier system. We use butyl tape exclusively for seam sealing, both because of its long-term adhesion to polyethylene and its resistance to moisture and temperature cycling.
This wall-to-sill coverage eliminates the vertical moisture migration pathway that accounts for a significant percentage of crawl space humidity in Westport homes. The combination of floor coverage, properly lapped and taped seams, and full wall coverage to the sill plate creates a complete moisture envelope that dramatically reduces crawl space humidity and protects the wood framing above.
The downstream benefits of a properly installed vapor barrier extend well beyond simply keeping the crawl space dry. If the barrier is incomplete or poorly sealed, a dehumidifier simply works harder against an unlimited moisture supply, running continuously and consuming excessive energy without achieving target humidity levels.
Every installation meets or exceeds Westport, IN building standards.
The materials we install in Westport are built to last decades, not years.
Full perimeter coverage is non-negotiable in our installation standard.
You receive documentation of your warranty before we leave the property.
We install reinforced polyethylene sheeting across the entire crawl space floor with full wall coverage and butyl-taped seams throughout.
Upgrading from 6-mil to 20-mil sheeting with proper seam sealing delivers measurably improved moisture performance in most cases.
The installation includes full seaming, perimeter taping, and wall coverage to the base of the finished wall or sill plate.
In basements with both vapor migration and liquid water management needs, we integrate dimple mat drainage board beneath the vapor barrier to channel any liquid water to a perimeter drain system.
Adding a properly sized dehumidifier completes the moisture management system and ensures consistent relative humidity control regardless of outdoor conditions.
We offer post-installation inspections for vapor barriers installed by other contractors, as well as for our own older installations, to assess barrier condition, seam integrity, and wall coverage completeness.
We measure the space, assess existing moisture conditions, document any existing barrier or mold, and identify all penetrations that will need to be addressed in the installation
Based on site conditions, we specify the appropriate mil rating, calculate material quantities, and plan the seaming layout for maximum coverage and minimum waste
Sheeting is laid, overlapped at 12 inches minimum, taped with butyl tape at all seams, and extended up all walls with mechanical fastening at the top edge
We walk through the completed installation with you, confirm all seams and coverages are complete, and provide written warranty documentation before leaving
"We had a previous vapor barrier installation that was barely 6-mil and had separated seams throughout. The humidity in our crawl space was unacceptable and we were starting to see mold on the floor joists. JCB Waterproofing and Construction removed the old liner and installed a commercial-grade system with butyl tape seams throughout. The difference in our indoor air quality was noticeable within a week."
"Very professional team that explained the difference between the grades of vapor barrier sheeting before recommending anything. The material quality and seaming were both done to a very high standard. We can already see the humidity meter reading dropping consistently."
"The crew extended the barrier all the way up the walls to the sill plate, which the contractor who did our original installation did not do. We had been missing that wall coverage and did not even know it. Great work from a team that clearly knows what they are doing."
Contact JCB Waterproofing and Construction for a free site evaluation and written estimate for vapor barrier installation in Westport